PROJECT HIGHLIGHT
Constructability Review for Structural Components of the Henry Hudson Bridge




Project Overview
American Structural Engineering (ASE) provided a design engineer to perform a comprehensive constructability review of the structural components for Contract HH-89 under MTA – NYCT. The ASE engineer reviewed design drawings, specifications, and the value engineering report, and prepared constructability comments to improve the efficiency, safety, and feasibility of the proposed construction. The work also included attending presentations by the design consultant, performing a field visit to assess real-world constructability, and participating in a formal presentation to MTA-TBTA representatives to communicate findings and recommendations.
Key Responsibilities
Reviewed structural design drawings and specifications
Evaluated value engineering reports for constructability issues
Prepared detailed constructability comments and recommendations
Attended design consultant presentations to provide feedback
Conducted field visit to assess construction feasibility
Participated in presentation to MTA-TBTA stakeholders
Ensured designs were practical, safe, and constructible
Project Details
Client Agency
MTA-NYCT
Timeline
2022
Location
New York, NY
Related Projects
Explore similar structural engineering works.

New York State, USA
Regions 3 & 7 Biennial Bridge Inspection
NYSDOT
Read Case Study

Lewiston, NY Related Projects
Robert Moses Niagara Power Plant, Bridge Inspection Project
NYPA
Read Case Study

New York, NY Related Projects
R44 SIR (Staten Island Railroad) Inspection of the Car Framing
MTA-NYCT
Read Case Study

New York, NY
Kent Avenue, Brooklyn (MPT Plans) (HWK1048-C)
NYCDDC/NYCDOT
Read Case Study

New York, NY
Bronx Whitestone Bridge Biennial Inspection
TBTA
Read Case Study